Success Stories / PETROBEL
 
 
  PETROBEL Success Story  
 Challenge
In line with the aggressive plans to facilitate the data management in oil companies, MCS identified a project for Petrobel (Belayim Petroleum Co., Egypt) on “How to maintain the drilling data?”
MCS was chosen to implement a Drilling Data Management solution for Petrobel.
 We were faced with the following challenges 
 Historical well data was huge (more than 200 wells).
 Historical well data was hard to capture from hardcopy documents.
 Historical well data was incomplete.
 Data exists in many formats (ASCII, Excel, Word, pictures and hardcopy    documents).
 Solutions 
MCS was responsible to manage the project from collecting historical well data, data entry, Data Quality Control, installing the system ,training the personnel, helping the personnel in generating reports, and analyzing the performance.
 The solution focused on four main phases
   Training
    Requirements
   Moderate computer knowledge and experience using spreadsheet    software like MS Excel and sending emails through the Internet.
   Benefits
   Building the personnel capability of running the system .
 Enriching the importance of using information management systems in drilling management .
 Data Entry  
    Requirements
   Genesis DES is used for historical well data.
 Reasonable hardware configuration was required to run both entry systems.
   Benefits
   Capturing large amounts of high-accuracy data.
 Storing Data on a digital media and avoiding hardcopy loss or damage.
 Faster access to complex data.
 Reporting and Analysis
   
Requirements
   
MCS EOWRS is used to generate a large number of well report sets.
   Genesis Analyzer is used for comprehensive performance analysis.
 
   Benefits
   After completing the well,detailed End of Well Reports are generated by few clicks.
 Many types of reports can be generated such as; managerial reports, annual   activity reports, cost analysis, statistical reports.
 Performance analysis, Time breakdowns and learn Curves can be generated for a single well or group of wells at the same time.
 Deep trouble investigation is a very easy process for the solution user.
 Browsing and printing data in many forms such as plots and tables.
 Exporting summaries, charts and data tables to conventional office automation   software like MS Word or MS Excel is possible for later reuse.
 Well Design
  Requirements
Genesis Designer is used for well programs design.
   Benefits
   Using offset well data from the historical database, new well design is more   realistic.
 Design is made on company standards and real setup.
 Building realistic progress charts through statistical work and historical   performance.
 Predicting a reasonable cost chart based on historical well data.
Tools and Technology
  1. CSIRO Genesis DES
2. MCS EOWRS (End of Well Reporting System)
3. CSIRO Genesis Analyzer
4. CSIRO Genesis Designer
General Benefits
   One source of data continuously updated .
 Quick search for all information using a comprehensive strong query    method.
 Easy reproduction of reports and charts.
 Simple user-friendly Interface for average computer user.
 Knowledge Transfer is done smoothly at each user convenient time and    pace.
 Saving the Engineering time and cost.
 Building the company knowledge base & archiving all the drilling documentation.


 
about us | product lines | services | our customers | news | quality & hse | downloads
   © 2000-2006 MCS Modern Computing Services. All Rights Reserved.